How close can you get?
In order to maximize the space for trains, we need to minimize the space between tracks. The operating separation is 1 3/4″ rather than 2″. This allows for an extra siding.
A should have been railway
In order to maximize the space for trains, we need to minimize the space between tracks. The operating separation is 1 3/4″ rather than 2″. This allows for an extra siding.
Using BlocD8 from Team Digital. It directly plugs into LocoNet and signals track status onto the Bus for use by computer.
12 loco-hauled sidings, 5 diesel sidings, 3 standby sidings. From 8 to 3 ft in length
Bridging the board joint was achieved lined up via the alignment pins Ondrew had installed. The joint was held in place with bolts below the board and #8 3/4″ brass screws on top to which the rails were soldered. For…
Read more
The first module, first level (storage yard) is complete – on top and underneath. Here it is attached to the second module which still has the upper (Port Dinllaen) level attached. If you look closely you will see a big scary…
Read more