Looking good – Module #2 topside finished
12 loco-hauled sidings, 5 diesel sidings, 3 standby sidings. From 8 to 3 ft in length
A should have been railway
12 loco-hauled sidings, 5 diesel sidings, 3 standby sidings. From 8 to 3 ft in length
Bridging the board joint was achieved lined up via the alignment pins Ondrew had installed. The joint was held in place with bolts below the board and #8 3/4″ brass screws on top to which the rails were soldered. For…
Read more
The first module, first level (storage yard) is complete – on top and underneath. Here it is attached to the second module which still has the upper (Port Dinllaen) level attached. If you look closely you will see a big scary…
Read more
Imagine the Lleyn Peninsula with its own major port to Ireland as a rival to Holyhead. Imagine the train lines that are needed to service that port linked into the real railway network. That’s what the Port Dinllaen Lines…
Read more