The Golden Spike
At 5pm today, the last section of track for Port Dinllaen lines was laid – at Trefor Junction. The “spike” was a screw and it was brass and not gold, but it still reprints a milestone after 4 years of…
Read more
A should have been railway
At 5pm today, the last section of track for Port Dinllaen lines was laid – at Trefor Junction. The “spike” was a screw and it was brass and not gold, but it still reprints a milestone after 4 years of…
Read more
The module where the peninsula meets the outside circuit is the most complex I have – and after 3 weeks I have completed wiring it up.
As I wire up, I have been dividing the track into DCC zones. Each zone has a circuit breaker and the basic design is twofold – to isolate areas under human and computer control so that a short circuit in…
Read more