Port Dinllaen Lines
A should have been railway
Port Dinllaen Lines > Construction > Electrical > Wiring Complete on the biggest module
Author: tynewydd September 8, 2016 0 Comments
Construction, Electrical
The module where the peninsula meets the outside circuit is the most complex I have – and after 3 weeks I have completed wiring it up.
← Previous post
Next post →
You must be logged in to post a comment.