High-wire Act
Now that the last of the backdrops have been installed, I am doing research for the scenery that we want to represent. In the back corner, I have a place where the narrow-gauge slate quarry line disappears (to conceal its…
Read more
A should have been railway
Now that the last of the backdrops have been installed, I am doing research for the scenery that we want to represent. In the back corner, I have a place where the narrow-gauge slate quarry line disappears (to conceal its…
Read more
LCUT provided a “large” signalbox – Welsh “Ty Mawr” -> Large House – which I assembled for Port Dinllaen – a >100 lever box but possibly using electo-pneumatic levers, which reduces the length. The assembly took 2 hours while watching the…
Read more
The ideal place for a signal box at Pont Llynfi Junction (PLJ) is between the Bay platform and Platform 3. All the trains to and from Nantlle have to come to these platforms, while goods will only be one track further…
Read more
Now the Coaling tower is ready, we can get more of a sense of the visual layout of the sheds. On the left the old shed, then the turntable, the new North View Shed, the ash tower and the coaling tower….
Read more